Category: Technical Solutions
News
 –Â
 elÂ
October 1, 2013
 a lasÂ
1:22 pm
First shipment of Würth CIS modules available as from October 1st Zug/Asunción. On October 1st, The meeco Group’s subsidiary, meeco América Latina S.A., will
 –Â
 elÂ
September 18, 2013
 a lasÂ
10:56 am
The meeco Group installs 143 kWp rooftop system for investor World in Balance Zug/Blaubeuren. After successfully supporting and advising World in Balance in the
 –Â
 elÂ
August 8, 2013
 a lasÂ
12:24 pm
30 kW/80 kWh solar hybrid installation reduces diesel generator use by 80 percent Zug/Luanda. The Swiss-based meeco Group has finalized its first sun2liveTM
 –Â
 elÂ
July 22, 2013
 a lasÂ
2:16 pm
1.4 kW solar generator with storage reinforces small-sized sun2live solutions Zug. The meeco Group has recently added a new product innovation to its sun2live
 –Â
 elÂ
July 16, 2013
 a lasÂ
1:26 pm
Clients in Paraguayan Chaco choose 490 Wp sun2flow kit to save costs Zug/Asunción. meeco América Latina S.A., a subsidiary of the Swiss meeco Group,
 –Â
 elÂ
June 24, 2013
 a lasÂ
12:45 pm
6.7 kWp rooftop installation to be upgraded to hybrid 13 kWh storage solution Zug/Lahore. Following the rooftop installation at the Lahore University of Management Sciences
 –Â
 elÂ
June 5, 2013
 a lasÂ
2:20 pm
meeco supplies 15.68 kWp of remote solar water-pumping in Pitiantuta, Chaco ZUG/ASUNCIÓN.  The Swiss meeco Group, via its local subsidiary meeco América Latina S.A.,
 –Â
 elÂ
January 18, 2013
 a lasÂ
10:44 am
New solar water pumping system by meeco América Latina in Chaco, Paraguay meeco América Latina S.A., the Asunción-based subsidiary of The meeco Group, has
 –Â
 elÂ
December 12, 2012
 a lasÂ
3:01 pm
meeco América Latina installs solar water pumping system in Mistolar, Paraguay Situated on the Pilcomayo River near the Argentinean border and 300 km away
 –Â
 elÂ
August 30, 2012
 a lasÂ
3:35 pm
SETL of Mauritius and the Swiss meeco Group about to reach megawatt installed capacity in Mauritius The Municipality of Port Louis, capital of Mauritius,