The meeco Group completes first off-grid residential system in Angola

 

30kW / 80kWh Project Angola meeco

30 kW/80 kWh solar hybrid installation reduces diesel generator use by 80 percent

Zug/Luanda. The Swiss-based meeco Group has finalized its first sun2liveTM off-grid installation in Angola, situated in Praia do Sangano near Cabo Ledo, 120 km south of Luanda. This turnkey installation, which combines a 30 kWp solar photovoltaic generator and an 80 kWh lithium battery system, supported by a structure custom-built on-site, is a perfect example of a sun2liveTM energy solution. The newly installed 24/7 solar and energy storage residential system, which includes a 65 kWh back up generator, now allows the owner to be fully self-sufficient and carbon free when it comes to power supply and energy management.

Read more